Suggestions for the advancement of PGMO DPi of San Javier (08/06/2012)

One of the most important issues currently being undertaken by the City Council, with greater importance for the future of our City, is undoubtedly the Advancement of PGMO Review of San Javier, an issue which has received the affirmative vote of IPRs in the plenary session which was approved, despite being expressed by our spokesperson a number of anomalies and suggestions that we hope will be resolved during the processing thereof.

Coinciding with the completion of the first installment of that exposure DPi presented in writing the last day May 28 alternatives and suggestions after careful study we found suitable to be considered by the drafting team, and the government team so that if the consider appropriate to be included in that review, to understand that they significantly improve several of the issues raised in the paper originally submitted as Advancement of PGMO Review of San Javier, which are:

1 st. - Continue with the drafting of the Revised General Plan, as required by San Javier until they acquire a sufficient degree of development that will make a new advance with each and every one of the criteria, objectives and general solutions that require San Javier.

2 nd. - The analysis and study of the general structure and organic territory proposed in advance, not seen improvement over the present, poses no alternative to the chaos of traffic, no clearances are general, are linear or corpuscles isolated minor nature, that nothing could be seen to articulate general or soil structure.

SUGGEST Therefore, studies articulating the structure of the soil, based on possible developments "radio central," "anillares", "concentric", "radio" or perhaps even more current and urbanism of the century "reticular" reaching hierarchical marking solutions most appropriate to the anticipated growth and the reality of San Javier.

3 rd. - There are reconciled, nor articulate general systems form the backbone of the urban fabric of San Javier, do not rely on existing and expected future developments planned satisfactorily resolved by the PGMO of San Javier.

We therefore suggest that consideration be articulating a hierarchical structure of the General Systems vertebradotes around the urban fabric and building land, with the necessary provisions for that in the future by providing developing the Plan, (we do not have to look like get after building).

4 th. - The population center of Loma de Arriba, has been dismantled and abandoned to their fate, in a land Industrial and Economic Activities surrounding the urban core, we propose to provide general systems of communication, community facilities so to be feasible and safeguard the future of the residents of the Loma.

5 th. - In the area of ​​desalination, the treatment plant, gas station, becomes a reservoir of long-term soil for hotels, PROPOSE and suggest that an in-depth study foreordained-depth of this land for development in the short term .

That the general systems of open spaces are located so that serve as transition, filter and attenuation of these existing equipment so troublesome, so that could permit the future use and safeguard Hospitality is intended.

6 th. - Are classified much land as buildable sectored, development in the short term, justifying its real possibilities, PROPOSE, more justified to classify soils peripherals such as developable non-sectorized (long term), set of rapid sectoring (pass short term).

Not to tax the owners of these soils with presentations sectored high valuation list, with the economic damage that is these days.

7 th. - Even in the case of an Advance general planning, the term of San Javier is very small, it could have gone further in many aspects such as definition, study and establishment of new equipment, among which include:

1) Reserve land for public buildings and dotacionales.

2) Expansion of existing public buildings.

3) Greater anticipation of expansion areas for recreational activities.

4) New road infrastructure articulating the urban fabric.

8 th. - PROPOSE the consideration of environmental issues, such as:

1) The protection of soils of the protected buffer.

2) The protection of the Regional Park of Las Salinas.

3) The conditions of trails, boulevards and public waterways, the need to provide energy corridors protected from urbanization to avoid radio conditions, among others.

4) The proper consideration of the amount of developable land unsectorised to provide in relation to the Kyoto protocol.

9 th. - It has been observed in different planes classifications and boundaries varied in the area of ​​the Esplanade of Lo Pagan, which could lead to error, we propose that it be reviewed in order to unify and define the appropriate scope, intended uses and its future prospects, suggesting the figure of the Special Plan of Urban Adaptation provided for in the regional Land Law.

10 th. - There is a solution for the management of "Saez", through the formulation of a Special Plan, which rely on the experience of other general plans, see Cartagena, has not been possible to carry them out successfully.

11 th. - There is established a planning model based on criteria and objectives of shallow draft and only exposed in just over five pages, so we suggest as an alternative proposal, it drafted a new document AVANCE's Review PGMO St. Pedro del Pinatar, based on a model Territorial clear, justified, coherent, we all want for our people and for that we must establish two major starting points for great value Urban:

1 °. - TERRITORIAL MODEL:

1 °., Where clearly the territory structure: Ensure appropriate access conditions, accessibility and communication of the territory.

2 °., Favor the installation of productive activities, institutional and residential.

3 °. - Encourage territorial changes necessary for urban management.

The claims that serve to materialize the territorial model, must be based on attractive and interesting aspects of social relevance such as:

Sustainable development: obtaining a model of ecologically sustainable city.

Extension of the major services, focused and coordinated with the new planned urban growth.

Planning facilities and public spaces, open spaces and green areas in a hierarchical and orderly.

Achievement of a valid communication system (plot "orthogonal mesh", not radial).

Comprehensive treatment of the landscape resources.

Strategic residential expansion.

Industrial expansion and considered adequate.

Anticipation of a General System of Red Road.

Creation of a general systems dotacionales community facilities commensurate with the needs generated by new developments.

2 °. - SYSTEMS ESSENTIAL PURPOSE.

2 ° .1. - Urban in character.

2 ° .2. - The socio-economic order.

2 ° .3. - In relation to facilities and open spaces.

2 ° .4. - In relation to built heritage.

2 ° .5. - In relation to the environment and undeveloped land.

2 ° .6. - In relation to the overall structure and organic.

2 ° .7. - In relation to existing scattered rural communities.

Source: Democracia Pinatarense

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información